3.2 Basic Scrum Rules
Here is a list of basic rules in scrum:
- Every sprint is four weeks or less in duration.
- There are no breaks between sprints.
- Every sprint is the same length.
- The intention of every sprint is to create “potentially shippable” software.
- Every sprint includes sprint planning.
- The sprint planning meeting is time boxed to 2 hours in a 1-weeks sprint, and 4 hours if two weeks sprint and so on.
- The daily scrum takes place every day at the same time of day.
- The daily scrum is time boxed to 15 minutes.
- Every sprint includes sprint review for stakeholder feedback on the product.
- Every sprint includes sprint retrospective for the team to inspect and adapt.
- Review and retrospective meetings are time boxed in total to 2 hours in a 1-weeks sprint, and 4 hours if two weeks sprint and so on.
- There is no break between sprint review and retrospective meetings.